2002/08/16 |
The station is shingled, but no canopy is installed yet.
|
2002/08/08 |
The outside walls of the first floor are all up & the
builders expect to start block laying on the washrooms tomorrow evening.
|
2002/08/04 |
(click on picture) The station foundation.
|
2002/08/04 |
(click on picture) The washroom foundation.
|
2002/07/23 |
The basement walls were poured today. Tomorrow it will be stripping the forms, and then waterproofing.
We then will have to get our plumber down to put the piping in under the basement floor, etc.
Then we will probably have a day or so off before back-filling the basement, so that it will
be well set!
|
2002/07/22 |
(click on picture) Preparing the foundation for pouring.
|
2002/07/22 |
(click on picture) Excavation for the station foundation.
|
2002/06/27 |
The water line for the station bathrooms was installed across Main Street today.
|
2002/06/06 |
The first dig for the station. Note the large stones in the foreground - these are foundation stones from
the old station in the same location.
|